Pavansara Renewables, a fictional wind farm operator.

Runs and repowers old wind farms: 120 MW under management across four states, 45 MW of it its own. Its August 2026 on LinkedIn, planned, written and designed by NexSocials.

  • 21pieces
  • 16company page
  • 5Senthil’s profile
  • 1article

What the month does

Gives the owner of an old wind farm the questions that tell a tired site from a tired turbine.

Written for
The asset manager at a fund or power producer that owns ageing wind farms.
Where
Tamil Nadu, Andhra Pradesh, Karnataka and Gujarat
Its themes
Tired site or tired turbine · The 25.4 gigawatts that hasn't moved · The number we said at the start · How this work is actually contracted
How often
Something goes out on 17 of August’s 21 weekdays.

Five pieces from the month, at full size.

The strongest of the 21, each with why it was made this way.

The graphic: Told the wind was poor. Two machines were stopped.

01Evidence

Fourteen machines, and for years the owners were told the wind had been poor.

Single image Pavansara Renewables’s page Mon 3 Aug

Why it was made this way

For the owner whose farm's decline is explained by the same people paid to prevent it.

Source: DNV GL, Definitions of Availability Terms for the Wind Industry, white paper EAA-WP-15, 9 August 2017, p.5. Source: Arithmetic — 2 ÷ 14 × 11 ÷ 52 ≈ 3% of a year's output, assuming machines of equal size and average wind in those weeks.

Tired site or tired turbine: what your own data can tell you before you spend anything

A falling farm total cannot say whether the wind changed or the machines did. The farm's own records, read machine by machine, usually can, and most owners already hold them.

When the wind falls, it falls on every machine on the site at once. A machine that falls behind its neighbours, and stays behind, is telling you something the wind cannot.

That is the whole method in two sentences, and in my experience most owners of old wind farms never use it. They judge the farm by its total: this year against last year. When the number has been falling for a few years, the conclusion arrives on its own. The site is tired.

… 6 minutes to read in full

03

Diagnosis — is the site tired, or is the machine?

Article Senthil Kumar Ramasamy’s profile Fri 14 Aug

Senthil Kumar RamasamyManaging Director, Pavansara Renewables

I have told four owners in three years that their site was not worth repowering. I told them to sell.

Qualifying was never the question.

The 2023 national policy asks a repowered project to show at least 1.5 times the old generation.

…

04Point of view

How a number is arrived at, and what it is worth

Text post Senthil Kumar Ramasamy’s profile Thu 27 Aug

Why it was made this way

For owners being sold a repowering who fear a project that passes the test and loses money.

Source: Centre for Science and Environment (Binit Das), Facilitating Wind Repowering, 2025 (the 2023 national policy: "at least a 1.5x increase in actual energy generation").

The graphic: 110 turbines installed. 15 still turn.

05Explains

Tamil Nadu's own first turbines: 110 commissioned between 1985 and 1992, and 15 still turning.

Single image Pavansara Renewables’s page Fri 7 Aug

Why it was made this way

For the owner of 1980s and 1990s machines who fears a stoppage nobody can fix.

Source: SolarQuarter, "Tamil Nadu's First Repowering-Based Wind–Solar Hybrid Project Receives TNERC Approval", 22 October 2025. Source: Renewable Watch, "Overcoming O&M challenges", 27 June 2021.

The whole month: all 21 pieces.

In the order they go out. Tap any piece to see it in the month on LinkedIn.

Pavansara Renewables’s pageSenthil Kumar Ramasamy’s profile

Four questions to ask before anyone writes for you.

Each answered from Pavansara Renewables’s month, not from a promise.

  1. 1Will it sound like us?

    Two voices in one month: the company’s, and Senthil Kumar Ramasamy’s own. Both come from one form of 20 questions, filled in once.

    Pavansara Renewables’s page
    Fourteen machines, and for years the owners were told the wind had been poor. Two of them had not turned in eleven weeks.
    Senthil Kumar Ramasamy’s profile
    "Normal for its age" is an answer about the machine. Owners hear it about the land.
    See the form
  2. 2Will it be accurate?

    17 of the 21 pieces end on a Source line, naming the document behind them, so a reader can check it. One, word for word:

    Source: Centre for Science and Environment (Binit Das), Facilitating Wind Repowering, 2025, executive summary.

    The month cites, among others

    • Centre for Science and Environment
    • DNV GL
    • Karnataka Electricity Regulatory Commission
    • 3E
    • Bruce Bailey
  3. 3Will it take my time?

    Your side of a month like this one: under 30 minutes. The form once, then approvals on your phone.

    1. You, onceThe form of 20 questions
    2. NexSocialsThe plan, the writing, the design, the sources
    3. You, on your phoneApprove the month’s plan, then each week’s posts
    See how a month works
  4. 4What will the posts do?

    More than announce. Of the month’s 19 planned posts:

    • 9explain how something works
    • 2show evidence: a figure, a record, a clause
    • 6give a point of view, in the voice of a person
    • 2say what the company does, and for whom

    And one for a day the country marks, outside the plan.

21 pieces, one August. Your month starts with a visibility report.

We read your page and your profile the way your buyers do, and tell you what a month like this would say for you.

Pavansara Renewables Pvt. Ltd. and its people are fictional, made for this demonstration. The documents its posts cite are real, and named in their Source lines, so each one can be checked.

Preview How Pavansara Renewables’s August 2026 appears on LinkedIn on LinkedIn

Pavansara Renewables

Runs and repowers old wind farms: 120 MW under management across four states, 45 MW of it its own.

Wind farm operations and repowering

  1. Pavansara Renewables

    Wind farm operations and repowering

    3 Aug Public

    Fourteen machines, and for years the owners were told the wind had been poor. Two of them had not turned in eleven weeks

    Fourteen machines, and for years the owners were told the wind had been poor. Two of them had not turned in eleven weeks. The cluster was old, small machines, held between a group of investors. Generation had fallen for several years, and the explanation from their maintenance contractor never changed: the wind had been poor. We put up measurement for four months. That is not a full assessment of a site's wind. It was enough to see what had happened. The wind was fine. Two machines had not turned in eleven weeks, and nobody had reported it. How does that go unseen? If a monthly report gives only the farm's total, a stopped machine is one line inside a bigger number. And DNV, in its paper on how availability is defined, says the availability in monthly operating reports is likely to be the contractual kind, with some downtime left out of the count. Two of fourteen machines is one-seventh of the cluster. Stopped for eleven weeks, that is about 3% of a year's output, if those weeks had average wind. In a farm's total, that is small enough to be put down to the weather. Which is what happened. The site was not tired. Two machines were stopped. A farm's total can hide a stopped machine. A report for each machine cannot.

    Source: DNV GL, Definitions of Availability Terms for the Wind Industry, white paper EAA-WP-15, 9 August 2017, p.5. Source: Arithmetic — 2 ÷ 14 × 11 ÷ 52 ≈ 3% of a year's output, assuming machines of equal size and average wind in those weeks.

    #PavansaraRenewables #WindOandM #WindEnergyIndia

    The graphic: Told the wind was poor. Two machines were stopped.
    LikeCommentRepostSend
  2. Pavansara Renewables

    Wind farm operations and repowering

    5 Aug Public

    This matters if you own wind machines in Karnataka whose first 20-year PPA is ending. Apply at least 90 days before it expires

    This matters if you own wind machines in Karnataka whose first 20-year PPA is ending. Apply at least 90 days before it expires. On 1 July 2026, Karnataka's regulator issued an order on wind PPAs that have completed, or are close to completing, their first 20 years. It was written because renewals kept reaching the regulator late, often after the PPA had expired, and some generators were left supplying power without a valid agreement. As reported, a generator that wants to keep supplying can renew for ten more years. The tariff is 85% of the one in the twentieth year, or a negotiated tariff if that is lower. The renewed agreement is deemed approved. No separate approval from the regulator is needed. If the distribution company does not finish the renewal before the PPA expires, the agreement continues on the terms of the regulator's March 2024 order. That order matters for the decision. It set the tariff for the ten years after the twentieth without any escalation, whatever the generator spends on repairs and maintenance. The date that matters is the application. It has to go in at least 90 days before expiry. The reports do not say what happens to one made later. For an owner weighing renewal against repowering, that window is also a deadline for the decision. Ten flat years at 85% on a machine that keeps ageing is a real alternative to a new one, and the two should be compared before the window closes. Put each PPA's expiry date in the diary, less 90 days.

    Source: Karnataka Electricity Regulatory Commission, suo motu order of 1 July 2026, as reported by WindInsider, 6 July 2026, and Energetica India, 14 July 2026. The order number is not established. Source: Karnataka Electricity Regulatory Commission, order of 4 March 2024, as reported by SolarQuarter, 6 March 2024.

    #PavansaraRenewables #KarnatakaWind #WindEnergyIndia

    The graphic: 85% of the old tariff, for ten more years.
    LikeCommentRepostSend
  3. Pavansara Renewables

    Wind farm operations and repowering

    6 Aug Public

    A repowering business case can be right about the new machines and wrong about the old ones. Every repowering case compares two numbers: what the new

    A repowering business case can be right about the new machines and wrong about the old ones. Every repowering case compares two numbers: what the new machines will produce, and what the old farm produces now. The second gets far less attention than the first. If the old farm is losing energy it does not have to lose, the comparison credits the new machines with a gain that better maintenance could have delivered. How much energy is that? Industry estimates put availability losses at around 6% and performance losses at around 4% for a typical wind farm. Those figures are from 2016 and describe the industry in general, not India. Nobody has published an Indian figure for how much maintenance alone recovers. That gap is the point. Without a measured baseline, nobody can say how much of a proposed gain belongs to the new machines. Our main work is repowering. We would still price the maintained farm first, because a case built on a neglected baseline looks better on paper than it will in the ground. Then the decision is clean. If repowering beats the farm as it could be running, it is worth doing. If it only beats the farm as it is, it is not yet. Repower against the farm at its best, not at its worst. Was your baseline measured before the farm was maintained, or after?

    Source: Bruce Bailey, "The State of Wind Farm Underperformance Syndrome", Wind Systems Magazine, 15 March 2016.

    #PavansaraRenewables #WindRepowering #WindOandM

    LikeCommentRepostSend
  4. Pavansara Renewables

    Wind farm operations and repowering

    7 Aug Public

    Tamil Nadu's own first turbines: 110 commissioned between 1985 and 1992, and 15 still turning. The rest stopped for want of spare parts

    Tamil Nadu's own first turbines: 110 commissioned between 1985 and 1992, and 15 still turning. The rest stopped for want of spare parts. Between 1985 and 1992, the state's energy agencies commissioned 110 turbines, 17.355 MW in all, among the first in Tamil Nadu. When the regulator approved a plan to replace them, in October 2025, 15 were still running. The rest had been condemned, because spare parts and maintenance support from their makers were no longer available. That is the old fleet's real constraint, and it is not the steel. A machine stops when nobody can get its parts. Renewable Watch, writing about wind O&M in 2021, put it plainly: "the availability of spare parts is very specific to OEMs." Whoever holds a make's parts has a large say in how long its machines run. For an owner, that turns a maintenance contract into a supply question. A servicer can be quick, cheap and honest, and still not be able to get a gearbox for a 1990s machine. The plan for those sites is now a replacement: a wind-solar hybrid of 18.75 MW of wind and 16 MW of solar. The list that matters is short: every make in your fleet, and where its next gearbox will come from.

    Source: SolarQuarter, "Tamil Nadu's First Repowering-Based Wind–Solar Hybrid Project Receives TNERC Approval", 22 October 2025. Source: Renewable Watch, "Overcoming O&M challenges", 27 June 2021.

    #PavansaraRenewables #WindOandM #TamilNaduWind

    The graphic: 110 turbines installed. 15 still turn.
    LikeCommentRepostSend
  1. Pavansara Renewables

    Wind farm operations and repowering

    10 Aug Public

    A ten-times repowering figure quoted in India started from a farm running at 8.5%. The multiple says as much about the old farm as the new one

    A ten-times repowering figure quoted in India started from a farm running at 8.5%. The multiple says as much about the old farm as the new one. The figure comes from a case study CSE published in 2020: a 6.5 MW wind farm with a capacity utilisation factor of 8.5%, repowered with 16 MW of new wind and 25 MW of solar. CSE reported that generation rose almost ten times. CSE does not say how the rise divides between the turbines and the solar. What the case does show is where it started. A multiple is new output divided by old. The less the old farm made, the larger the same new farm looks against it. Had the old farm run twice as well, the same result would read as about five times, not ten. So ten times from a farm at 8.5% is not a number to expect on a farm that is already running well. Here is one that is wind for wind. At Düngstrup in Germany, eight 1.3 MW turbines were replaced by four of 3 MW on the same site. The old farm produced 12 GWh a year. The new one produces 35. That is about 2.9 times, with no solar added. RWE, announcing three repowering projects in Germany, put the general case this way: "On average, modern turbines produce two to three times more electricity with fewer turbines." Three kinds of multiple get quoted. An estimate of what is possible. A delivered result. And a policy floor: India's 2023 national policy asks for at least 1.5 times. Each starts from a different old farm, and none of them carries over to yours without its starting number. A multiple without its starting number is not a number anyone can underwrite.

    Source: World Wind Energy Association, "Repowering: an efficient tool to boost wind power", 28 November 2023 (Düngstrup). Source: RWE, "More power, more green electricity: RWE renews three wind farms", press release, 1 March 2023 (Katja Wünschel). Source: Centre for Science and Environment, Repowering of the Indian Wind Sector — Opportunities and the Way Ahead, factsheet, December 2020, p.7 (the 6.5 MW case study). Source: Centre for Science and Environment (Binit Das), Facilitating Wind Repowering, 2025 (the national policy's 1.5 times).

    #PavansaraRenewables #WindRepowering #WindEnergyIndia

    Reading a wind repowering multiple4 pages

    Page 1 of 4: Ten times, from a farm running at 8.5%.Page 2 of 4: Wind for wind, same site: about 2.9 times.Page 3 of 4: The policy floor: at least 1.5 times.Page 4 of 4: Ask what the old farm made.
    LikeCommentRepostSend
  2. Pavansara Renewables

    Wind farm operations and repowering

    11 Aug Public

    Signed by Senthil Kumar Ramasamy — Managing Director

    Every owner of an old wind farm in Tamil Nadu has heard it: generation is down, and the wind was poor. Ask what that answer rests on

    Every owner of an old wind farm in Tamil Nadu has heard it: generation is down, and the wind was poor. Ask what that answer rests on. "The wind was poor" is either a measurement or an excuse. After a while, an owner who hears it every year stops asking questions, which is worse. I do not think the explanation is always wrong. Some years are weak. But a weak year is a number, and a number has a source. A production-based availability, the kind DNV describes and IEC 61400-26-1 defines, already needs an estimate of the energy a machine could have made in the wind that actually blew. So a servicer who says the wind was poor should be able to show it: the wind speed, from which instrument, over which period, against which longer record. If that wind speed comes from the turbine's own nacelle sensor, it is the machine reporting on itself. That is not nothing, but it is not an independent measurement. If there is no wind figure at all, the explanation is an opinion. The reputation I would hate most in this business is the contractor who blames the wind. Not because the wind is never to blame. Because nobody checked. When were you last shown the wind data behind a poor year? Senthil Kumar Ramasamy — Managing Director

    Source: DNV GL, Definitions of Availability Terms for the Wind Industry, white paper EAA-WP-15, 9 August 2017, p.6 (production-based availability). Source: IEC 61400-26-1:2019, Availability for wind energy generation systems.

    #PavansaraRenewables #WindOandM

    Quote card: "The wind was poor" is either a measurement or an excuse.
    LikeCommentRepostSend
  3. Pavansara Renewables

    Wind farm operations and repowering

    13 Aug Public

    This matters if you own a wind project in Andhra Pradesh that earns Generation Based Incentive. The Supreme Court has said whose money it is

    This matters if you own a wind project in Andhra Pradesh that earns Generation Based Incentive. The Supreme Court has said whose money it is. Generation Based Incentive is a central scheme that pays registered wind projects 50 paise for each unit fed into the grid. In Andhra Pradesh, the question was whether the regulator could take that incentive into account and set a lower tariff. On 25 March 2026 the Supreme Court held that it could not. In the court's words, the incentive "is intended to be disbursed to the GENCOs over and above the tariff". It also said that regulatory authority "cannot be exercised in a manner that nullifies the legislative or policy intent" of a scheme like this. For an owner, that settles how the two payments relate. The tariff is for the power. The incentive is for generating it. Neither is a discount on the other. The practical point is in the paperwork. A settlement that shows the two together makes it hard to see whether anything has been netted off. Owners whose projects earn the incentive now have a clear reason to read the two lines separately, every time. Two lines, read separately: the tariff, and the incentive. Do your statements show the incentive on its own line?

    Source: Supreme Court of India, 2026 INSC 294, judgment of 25 March 2026, as reported by Verdictum, 26 March 2026. Source: King Stubb & Kasiva, note on the judgment, 16 June 2026 (the scheme's 50 paise a unit).

    #PavansaraRenewables #AndhraPradeshWind #WindEnergyIndia

    LikeCommentRepostSend
  4. Pavansara Renewables

    Wind farm operations and repowering

    14 Aug Public

    When the wind falls, it falls on every machine on the site at once. A machine that falls behind its neighbours, and stays behind, is different

    When the wind falls, it falls on every machine on the site at once. A machine that falls behind its neighbours, and stays behind, is different. That is the starting point of this month's long read, by our Managing Director, Senthil Kumar Ramasamy, published on his profile today. Most owners judge an old farm by its total: this year against last year. A falling total cannot say whether the wind changed or the machines did. Each machine read against its neighbours, month by month, can say a good deal more, and an owner can usually ask for that data. Wakes and terrain make neighbouring machines differ. What matters is a change: a machine that used to keep pace with its neighbours and no longer does. The article walks through how to read it, which availability figure belongs beside it, and what NIWE's 15% screening line says about an old machine. It also covers the answer nobody selling repowering likes to give: sometimes the site is tired, and the right move is to sell. It does not replace measuring the wind. It tells you whether you need to. The full piece is on Senthil Kumar Ramasamy's profile today.

    Source: DNV GL, Definitions of Availability Terms for the Wind Industry, white paper EAA-WP-15, 9 August 2017. Source: Centre for Science and Environment, Repowering of the Indian Wind Sector — Opportunities and the Way Ahead, factsheet, December 2020 (NIWE's 15% line).

    #PavansaraRenewables #WindOandM #WindRepowering

    The graphic: Is it the wind, or the machine?
    LikeCommentRepostSend
  1. Pavansara Renewables

    Wind farm operations and repowering

    17 Aug Public

    Banks assess a repowering like a brand-new project. Its history is not priced

    Banks assess a repowering like a brand-new project. Its history is not priced. CSE's 2025 report on repowering is blunt about finance. Banks have no loan products built for it, and projects "often face very expensive loans or outright rejection". Lenders also struggle to value old turbines and parts, CSE says, so they find it hard to accept them as collateral. That misses what makes a repowering different from a new site. The wind is already proven, the land is held, and the connection exists, even if it needs upgrading. The help meant to close the gap went unused. Under the 2016 repowering policy, IREDA offered an extra 0.25% interest rebate. An RTI found that not a single project took it between 2016 and 2020. So the owner has to bring the advantage to the lender. Years of measured generation, the wind behind it, and a site assessment a lender can test. Without them, a repowering is credited as a new project and priced like one. A site's record is the collateral a bank cannot see unless someone puts it in front of them. Could you show a lender your site's measured wind today?

    Source: Centre for Science and Environment (Binit Das), Facilitating Wind Repowering, 2025, chapter on mobilising investment. Source: Centre for Science and Environment, Repowering of the Indian Wind Sector — Opportunities and the Way Ahead, factsheet, December 2020 (the 2016 policy's 0.25% rebate; the RTI to IREDA, para 11).

    #PavansaraRenewables #WindRepowering #WindEnergyIndia

    LikeCommentRepostSend
  2. Pavansara Renewables

    Wind farm operations and repowering

    18 Aug Public

    A turbine can count as available while it is not generating. It depends which availability your report uses

    A turbine can count as available while it is not generating. It depends which availability your report uses. Availability sounds like one number. It is at least four, and they answer two questions. The first is hours or energy. Time-based availability counts the hours a machine was available. Production-based availability counts the energy it made against the energy it could have made in the wind that blew. Across a farm, the two are often close. DNV says they differ by up to 2%, depending on the definitions used. One farm can still be far apart. At one Irish wind farm in 2007, machines were down 3% of the time but lost 11% of the energy. The difference is when the downtime falls. It can run the other way too. 3E, benchmarking 57 wind farms in Belgium, France and the Netherlands, found that good O&M practice makes production-based availability higher than time-based, because machines are generally stopped for maintenance in low wind. The second question is what is left out. Contractual availability is what the service contract defines, with some downtime left out by agreement. Technical availability has no such allowances, and DNV calls it the more accurate measure of how a machine performs. So a servicer can meet its contract in a month the owner loses energy, and both are telling the truth. Ask for the technical, energy-based figure beside the contractual one.

    Source: DNV GL, Definitions of Availability Terms for the Wind Industry, white paper EAA-WP-15, 9 August 2017, pp.5–6. Source: N. Conroy, J.P. Deane and B.P. Ó Gallachóir, "Wind turbine availability: Should it be time or energy based? – A case study in Ireland", Renewable Energy 36(11), 2011, pp.2967–2971. Source: 3E, "Benchmarking predicted and actual production losses", 15 April 2016.

    #PavansaraRenewables #WindOandM #WindEnergyIndia

    Four ways to calculate wind turbine availability4 pages

    Page 1 of 4: Available is not the same as generating.Page 2 of 4: Hours or energy?Page 3 of 4: What is left out?Page 4 of 4: Ask which one, in writing.
    LikeCommentRepostSend
  3. Pavansara Renewables

    Wind farm operations and repowering

    20 Aug Public

    Happy Akshay Urja Diwas to everyone working in India's renewable energy. Today marks the work of the people who plan it, build it, run it and keep it

    Happy Akshay Urja Diwas to everyone working in India's renewable energy. Today marks the work of the people who plan it, build it, run it and keep it running. Wind is a large part of that work. India's installed wind capacity stood at 57,443 MW, and wind generated 106 billion units in 2025–26 (Lok Sabha written reply, 22 July 2026). To everyone who keeps a machine turning, thank you.

    #PavansaraRenewables #AkshayUrjaDiwas

    The graphic: Happy Akshay Urja Diwas
    LikeCommentRepostSend
  4. Pavansara Renewables

    Wind farm operations and repowering

    21 Aug Public

    The feeder was built for 200 to 600 kW machines. The new ones are 2 to 3 MW

    The feeder was built for 200 to 600 kW machines. The new ones are 2 to 3 MW. CSE's 2025 report says most ageing wind farms are still connected to 11 kV and 33 kV feeders. The early 11 kV systems were built for turbines of 200 to 600 kW. A repowered cluster of 2 to 3 MW machines asks those lines to carry far more. How much more can they take? CSE puts it at a minor increase, about 50%, within the existing 11 and 33 kV networks. Beyond that, the feeders have to move to 33 or 66 kV. That upgrade is a capital line of its own. A business case priced on the turbines alone does not include it. CSE also lists what happens without it: higher line losses, overloading and poor power quality, which cut what the new machines can actually deliver. The turbines are the visible part of a repowering. The wire decides how much of it reaches the grid. So the order matters. Find out the feeder's voltage and the substation's spare capacity before pricing a single machine. Two numbers come before any quote: the feeder's voltage, and the substation's spare capacity.

    Source: Centre for Science and Environment (Binit Das), Facilitating Wind Repowering, 2025, chapter 3, "Aligning transmission systems".

    #PavansaraRenewables #WindRepowering #WindEnergyIndia

    The graphic: Built for 600 kW. Asked to carry 3 MW machines.
    LikeCommentRepostSend
  1. Pavansara Renewables

    Wind farm operations and repowering

    24 Aug Public

    Signed by Kavitha Raman — Head of Asset Performance

    A promised improvement is only as good as the number it starts from. Ask to see that number first

    A promised improvement is only as good as the number it starts from. Ask to see that number first. A proposal for an old wind farm can promise better availability, more generation, a better year, and never write down the number the improvement will be measured from. Without that number, nobody can check the promise afterwards. A good year can be credited to the work, and a poor one to the wind. So we work to one rule. We measure before we promise, and we publish the before and after. The before is the farm as it runs today, machine by machine. The after is the same measure, taken the same way, once the work is done. If the two are measured differently, the comparison is not worth reading. Owners come back because the number we said at the start is the number they got. In wind maintenance, that is rarer than it should be. Before you sign, ask for the starting number in writing, and how it was measured. Did your last contract write down the number it started from? Kavitha Raman — Head of Asset Performance

    #PavansaraRenewables #WindOandM

    Quote card: We measure before we promise, and we publish the before and after.
    LikeCommentRepostSend
  2. Pavansara Renewables

    Wind farm operations and repowering

    25 Aug Public

    Selling two or three old wind machines sounds like a simple way out. The grid connection may not go with them

    Selling two or three old wind machines sounds like a simple way out. The grid connection may not go with them. Many of India's oldest machines are held by families and small firms, often two or three each, bought in the sector's early years for the accelerated depreciation benefit. For an owner like that, selling can look easier than repowering: no new machines, no consortium of neighbours, no lender. CSE's 2025 report on repowering names what gets in the way. Small owners, it says, lack exit options because of "asset valuation uncertainties and the inability to transfer grid evacuation rights to potential buyers". The connection is the part a buyer needs most. Without it, the land and the machines are worth far less to anyone who wants to repower them. CSE does not cite the instrument behind this, and the position may differ by state and by the terms of the original approval. So the order matters. Establish whether the evacuation approval can pass to a buyer, and on what terms, before naming a price. A price set before that answer is a guess. Do you know whether your connection would go with a sale?

    Source: Centre for Science and Environment (Binit Das), Facilitating Wind Repowering, 2025, executive summary.

    #PavansaraRenewables #WindRepowering #WindEnergyIndia

    LikeCommentRepostSend
  3. Pavansara Renewables

    Wind farm operations and repowering

    27 Aug Public

    India's best old wind sites are also its most turbulent. Few new machines are certified for them

    India's best old wind sites are also its most turbulent. Few new machines are certified for them. India's oldest wind machines stand mostly on its best land: high average wind and high turbulence. In the standard's terms, Class I sites with turbulence category A, an intensity of 0.16. Machines for those sites are built heavier, because they must carry that load for their whole working life. CSE reviewed the approved list of turbine models in 2025: 35 models from 14 makers. It found only a handful rated for that turbulence, and many of those below 1 MW. A large number of the modern 3 to 5 MW machines are Class S, designs certified for a specific site rather than a standard class. That is not a fault in itself. A Class S machine can suit a Class I site, if the assessment for that site says it can. It does mean the question is never just which machine. It is which machine, certified for what, against which measured site. The best old land is where the choice of new machine is narrowest. Ask for the class and turbulence category the proposed machine is certified for, and the site assessment that matches it.

    Source: Centre for Science and Environment (Binit Das), Facilitating Wind Repowering: Addressing Barriers in Manufacturing, Finance, and Infrastructure for Legacy Wind Farms, 2025, chapter 2 (the RLMM of May 2025).

    #PavansaraRenewables #WindRepowering #WindEnergyIndia

    Turbine certification for India's old wind sites4 pages

    Page 1 of 4: The best old sites. Few new machines rated for them.Page 2 of 4: Of the few rated, many are below 1 MW.Page 3 of 4: Many 3 to 5 MW machines are Class S.Page 4 of 4: Ask what it is certified for.
    LikeCommentRepostSend
  1. Pavansara Renewables

    Wind farm operations and repowering

    31 Aug Public

    We will tell you whether your site is tired, or the turbine standing on it. Send us twelve months of generation, machine by machine

    We will tell you whether your site is tired, or the turbine standing on it. Send us twelve months of generation, machine by machine. Here is the offer, in full. Send us your last twelve months of generation, machine by machine. We will tell you whether the site is tired or the turbine standing on it is. Why machine by machine? A farm's total mixes the wind and the machines into one number. Each machine, set against its neighbours, starts to separate them. On one cluster, the owners had been told for years that the wind was poor. Four months of measurement found two machines that had not turned in eleven weeks. The answer decides what the money is for. If it is the turbine, the choice is between fixing it and replacing it. If it is the site, a new machine is money spent in the wrong place. Sometimes the answer will be the site, and we will say that too, even though our main work is repowering. Send the data here, or with the Contact us button on this page. Twelve months, every machine, one straight answer.

    #PavansaraRenewables #WindOandM #WindRepowering

    The graphic: Tired site, or tired turbine? We will tell you.
    LikeCommentRepostSend

August 2026 ends here: 16 posts on Pavansara Renewables’s page.

Senthil Kumar Ramasamy

Managing Director, Pavansara Renewables

  1. Senthil Kumar Ramasamy

    Managing Director, Pavansara Renewables

    5 Aug Public

    "Normal for its age" is an answer about the machine. Owners hear it about the land

    "Normal for its age" is an answer about the machine. Owners hear it about the land. I hear it on old sites all the time. Generation is low, and someone has told the owner that is normal for a machine of that age. Sometimes it is exactly right. CSE puts India's old sub-megawatt machines on its best wind sites at a capacity utilisation factor of 10 to 14%. A 1990s machine on good land does that. NIWE's own screening rule says a machine below 15% is technically ready for repowering. So a reading of 12%, inside that range, is not a verdict on the site. It is a verdict on the turbine standing on it. Where it goes wrong is the next step. The owner hears "normal", decides the site is tired, and stops asking. Some of those sites are among the best wind land in the country. When I started in this work, I was watching Indian sites run at half of what they should. The question I still ask first is not how old the machine is. It is what this land could do with a different one. Sometimes the land really is the problem. You only know after you have looked. When you were last told a number was normal for its age, did anyone say what the land could do?

    Source: Centre for Science and Environment (Binit Das), Facilitating Wind Repowering, 2025, chapter 2 (10–14% CUF for old machines on Class I sites). Source: Centre for Science and Environment, Repowering of the Indian Wind Sector — Opportunities and the Way Ahead, factsheet, December 2020, para 7 (NIWE: below 15% CUF, technically ready for repowering).

    #PavansaraRenewables #WindRepowering

    LikeCommentRepostSend
  1. Senthil Kumar Ramasamy

    Managing Director, Pavansara Renewables

    12 Aug Public

    India has 25,406 MW of wind on machines below 2 MW. The engineering is the easy part

    India has 25,406 MW of wind on machines below 2 MW. The engineering is the easy part. That figure is NIWE's estimate of the country's repowering potential, as CSE's 2025 report gives it. It counts machines below 2 MW, which is the 2023 policy's own line. In my view almost none of it has moved, and the reason is not the turbines. It is who owns them. A large share of the old capacity belongs to individuals and small firms who came in for the accelerated depreciation benefit, CSE says. Repowering means fewer, larger machines on the same land. So an owner with two machines in a cluster can end up with less than one. Consent has to be assembled across all of them, and that is slow work. Selling is not simple either. CSE lists the inability to transfer grid evacuation rights to a buyer among the things keeping small owners from leaving. And help that was offered went unused. Under the 2016 policy, an RTI found not a single project took IREDA's repowering interest rebate between 2016 and 2020. That is a paperwork problem being treated as an engineering problem. Until someone works on the ownership, the 25,406 MW will stay where it is. If you hold two machines in a cluster, who else would have to agree?

    Source: Centre for Science and Environment (Binit Das), Facilitating Wind Repowering, 2025 — Table 1 (NIWE's 25,406 MW), the ownership and evacuation-rights findings. Source: Centre for Science and Environment, Repowering of the Indian Wind Sector — Opportunities and the Way Ahead, factsheet, December 2020, para 11 (the RTI to IREDA).

    #PavansaraRenewables #WindRepowering

    LikeCommentRepostSend
  2. Senthil Kumar Ramasamy

    Managing Director, Pavansara Renewables

    14 Aug Public

    LikeCommentRepostSend
  1. Senthil Kumar Ramasamy

    Managing Director, Pavansara Renewables

    20 Aug Public

    Karnataka has made it easier for an old wind farm to carry on. For some owners, that is the right answer

    Karnataka has made it easier for an old wind farm to carry on. For some owners, that is the right answer. Since July, an owner whose first 20-year PPA is ending can renew for ten more years at 85% of the twentieth-year tariff, if the application goes in at least 90 days before expiry. I expect to hear that this will slow repowering in the state. Maybe. I do not think that is a bad thing on its own. I will not recommend repowering a site where the wind does not justify it. On a weak site with a sound machine, ten more years at 85% can beat a new machine that never earns back its cost. On a strong site with a tired machine, renewing is the expensive choice. It just does not look expensive, because nothing new is bought. The age of the machine does not tell you which case you are in. The measured wind on the site does, and so does what the machine makes of it. That is the work to do before the 90 days run out, not after. Renew or repower, the answer is in the land, not in the calendar. Which of your sites would you renew today, and on what evidence?

    Source: Karnataka Electricity Regulatory Commission, suo motu order of 1 July 2026, as reported by WindInsider, 6 July 2026.

    #PavansaraRenewables #WindRepowering

    LikeCommentRepostSend
  1. Senthil Kumar Ramasamy

    Managing Director, Pavansara Renewables

    27 Aug Public

    I have told four owners in three years that their site was not worth repowering. I told them to sell

    I have told four owners in three years that their site was not worth repowering. I told them to sell. Qualifying was never the question. The 2023 national policy asks a repowered project to show at least 1.5 times the old generation. That number decides whether a project counts as repowering. It does not decide whether it pays. What decides that is the wind on the site, the grid it connects to, and what the power will sell for. A site can clear 1.5 times and still not earn back the new machines. On those four sites, the measured wind did not justify the cost of new machines. Each time, that was a repowering job we did not do. I would rather an owner heard it from the people who could have done the work. The question I ask instead of "does it qualify" is simpler: what will this land produce with a new machine on it, measured, and what will that be worth? A policy floor is easy to clear and easy to sell. The site is harder to argue with. Clearing the floor is not a business case. Has anyone ever told you a site of yours was not worth repowering?

    Source: Centre for Science and Environment (Binit Das), Facilitating Wind Repowering, 2025 (the 2023 national policy: "at least a 1.5x increase in actual energy generation").

    #PavansaraRenewables #WindRepowering

    LikeCommentRepostSend

August 2026 ends here: 5 posts on Senthil Kumar Ramasamy’s profile.

1 of 21

Why it was made this wayFor the owner whose farm's decline is explained by the same people paid to prevent it.

Evidence · Diagnosis — is the site tired, or is the machine?

Pavansara Renewables

Wind farm operations and repowering

Mon 3 Aug public, Single image

Fourteen machines, and for years the owners were told the wind had been poor. Two of them had not turned in eleven weeks.

The cluster was old, small machines, held between a group of investors. Generation had fallen for several years, and the explanation from their maintenance contractor never changed: the wind had been poor. We put up measurement for four months. That is not a full assessment of a site's wind. It was enough to see what had happened. The wind was fine. Two machines had not turned in eleven weeks, and nobody had reported it. How does that go unseen? If a monthly report gives only the farm's total, a stopped machine is one line inside a bigger number. And DNV, in its paper on how availability is defined, says the availability in monthly operating reports is likely to be the contractual kind, with some downtime left out of the count. Two of fourteen machines is one-seventh of the cluster. Stopped for eleven weeks, that is about 3% of a year's output, if those weeks had average wind. In a farm's total, that is small enough to be put down to the weather. Which is what happened. The site was not tired. Two machines were stopped. A farm's total can hide a stopped machine. A report for each machine cannot.

Source: DNV GL, Definitions of Availability Terms for the Wind Industry, white paper EAA-WP-15, 9 August 2017, p.5. Source: Arithmetic — 2 ÷ 14 × 11 ÷ 52 ≈ 3% of a year's output, assuming machines of equal size and average wind in those weeks.

#PavansaraRenewables #WindOandM #WindEnergyIndia

The graphic: Told the wind was poor. Two machines were stopped.
LikeCommentRepostSend

2 of 21

Why it was made this wayFor Karnataka owners who fear missing a date that decides the next ten years of income.

Explains · Repowering in India — the 25.4 GW that has not moved

Pavansara Renewables

Wind farm operations and repowering

Wed 5 Aug public, Single image

This matters if you own wind machines in Karnataka whose first 20-year PPA is ending. Apply at least 90 days before it expires.

On 1 July 2026, Karnataka's regulator issued an order on wind PPAs that have completed, or are close to completing, their first 20 years. It was written because renewals kept reaching the regulator late, often after the PPA had expired, and some generators were left supplying power without a valid agreement. As reported, a generator that wants to keep supplying can renew for ten more years. The tariff is 85% of the one in the twentieth year, or a negotiated tariff if that is lower. The renewed agreement is deemed approved. No separate approval from the regulator is needed. If the distribution company does not finish the renewal before the PPA expires, the agreement continues on the terms of the regulator's March 2024 order. That order matters for the decision. It set the tariff for the ten years after the twentieth without any escalation, whatever the generator spends on repairs and maintenance. The date that matters is the application. It has to go in at least 90 days before expiry. The reports do not say what happens to one made later. For an owner weighing renewal against repowering, that window is also a deadline for the decision. Ten flat years at 85% on a machine that keeps ageing is a real alternative to a new one, and the two should be compared before the window closes. Put each PPA's expiry date in the diary, less 90 days.

Source: Karnataka Electricity Regulatory Commission, suo motu order of 1 July 2026, as reported by WindInsider, 6 July 2026, and Energetica India, 14 July 2026. The order number is not established. Source: Karnataka Electricity Regulatory Commission, order of 4 March 2024, as reported by SolarQuarter, 6 March 2024.

#PavansaraRenewables #KarnatakaWind #WindEnergyIndia

The graphic: 85% of the old tariff, for ten more years.
LikeCommentRepostSend

3 of 21

Why it was made this wayFor the asset manager who fears approving a project on a gain maintenance alone could deliver.

Point of view · How a number is arrived at, and what it is worth

Pavansara Renewables

Wind farm operations and repowering

Thu 6 Aug public, Text post

A repowering business case can be right about the new machines and wrong about the old ones. Every repowering case compares two numbers: what the new machines will produce, and what the old farm produces now. The second gets far less attention than the first. If the old farm is losing energy it does not have to lose, the comparison credits the new machines with a gain that better maintenance could have delivered. How much energy is that? Industry estimates put availability losses at around 6% and performance losses at around 4% for a typical wind farm. Those figures are from 2016 and describe the industry in general, not India. Nobody has published an Indian figure for how much maintenance alone recovers. That gap is the point. Without a measured baseline, nobody can say how much of a proposed gain belongs to the new machines. Our main work is repowering. We would still price the maintained farm first, because a case built on a neglected baseline looks better on paper than it will in the ground. Then the decision is clean. If repowering beats the farm as it could be running, it is worth doing. If it only beats the farm as it is, it is not yet. Repower against the farm at its best, not at its worst. Was your baseline measured before the farm was maintained, or after?

Source: Bruce Bailey, "The State of Wind Farm Underperformance Syndrome", Wind Systems Magazine, 15 March 2016.

#PavansaraRenewables #WindRepowering #WindOandM

LikeCommentRepostSend

4 of 21

Why it was made this wayFor the owner of 1980s and 1990s machines who fears a stoppage nobody can fix.

Explains · How this work is contracted

Pavansara Renewables

Wind farm operations and repowering

Fri 7 Aug public, Single image

Tamil Nadu's own first turbines: 110 commissioned between 1985 and 1992, and 15 still turning. The rest stopped for want of spare parts.

Between 1985 and 1992, the state's energy agencies commissioned 110 turbines, 17.355 MW in all, among the first in Tamil Nadu. When the regulator approved a plan to replace them, in October 2025, 15 were still running. The rest had been condemned, because spare parts and maintenance support from their makers were no longer available. That is the old fleet's real constraint, and it is not the steel. A machine stops when nobody can get its parts. Renewable Watch, writing about wind O&M in 2021, put it plainly: "the availability of spare parts is very specific to OEMs." Whoever holds a make's parts has a large say in how long its machines run. For an owner, that turns a maintenance contract into a supply question. A servicer can be quick, cheap and honest, and still not be able to get a gearbox for a 1990s machine. The plan for those sites is now a replacement: a wind-solar hybrid of 18.75 MW of wind and 16 MW of solar. The list that matters is short: every make in your fleet, and where its next gearbox will come from.

Source: SolarQuarter, "Tamil Nadu's First Repowering-Based Wind–Solar Hybrid Project Receives TNERC Approval", 22 October 2025. Source: Renewable Watch, "Overcoming O&M challenges", 27 June 2021.

#PavansaraRenewables #WindOandM #TamilNaduWind

The graphic: 110 turbines installed. 15 still turn.
LikeCommentRepostSend

5 of 21

Why it was made this wayFor the asset manager who fears underwriting a multiple that will not repeat on their own farm.

Evidence · How a number is arrived at, and what it is worth

Pavansara Renewables

Wind farm operations and repowering

Mon 10 Aug public, Carousel, 4 pages

A ten-times repowering figure quoted in India started from a farm running at 8.5%. The multiple says as much about the old farm as the new one.

The figure comes from a case study CSE published in 2020: a 6.5 MW wind farm with a capacity utilisation factor of 8.5%, repowered with 16 MW of new wind and 25 MW of solar. CSE reported that generation rose almost ten times. CSE does not say how the rise divides between the turbines and the solar. What the case does show is where it started. A multiple is new output divided by old. The less the old farm made, the larger the same new farm looks against it. Had the old farm run twice as well, the same result would read as about five times, not ten. So ten times from a farm at 8.5% is not a number to expect on a farm that is already running well. Here is one that is wind for wind. At Düngstrup in Germany, eight 1.3 MW turbines were replaced by four of 3 MW on the same site. The old farm produced 12 GWh a year. The new one produces 35. That is about 2.9 times, with no solar added. RWE, announcing three repowering projects in Germany, put the general case this way: "On average, modern turbines produce two to three times more electricity with fewer turbines." Three kinds of multiple get quoted. An estimate of what is possible. A delivered result. And a policy floor: India's 2023 national policy asks for at least 1.5 times. Each starts from a different old farm, and none of them carries over to yours without its starting number. A multiple without its starting number is not a number anyone can underwrite.

Source: World Wind Energy Association, "Repowering: an efficient tool to boost wind power", 28 November 2023 (Düngstrup). Source: RWE, "More power, more green electricity: RWE renews three wind farms", press release, 1 March 2023 (Katja Wünschel). Source: Centre for Science and Environment, Repowering of the Indian Wind Sector — Opportunities and the Way Ahead, factsheet, December 2020, p.7 (the 6.5 MW case study). Source: Centre for Science and Environment (Binit Das), Facilitating Wind Repowering, 2025 (the national policy's 1.5 times).

#PavansaraRenewables #WindRepowering #WindEnergyIndia

Reading a wind repowering multiple4 pages

Page 1: Ten times, from a farm running at 8.5%.Page 2: Wind for wind, same site: about 2.9 times.Page 3: The policy floor: at least 1.5 times.Page 4: Ask what the old farm made.
LikeCommentRepostSend

6 of 21

Why it was made this wayFor the owner who fears being given, every year, an explanation nobody can check.

Point of view · Diagnosis — is the site tired, or is the machine?

Pavansara Renewables

Wind farm operations and repowering

Tue 11 Aug public, Quote card

Signed by Senthil Kumar Ramasamy — Managing Director

Every owner of an old wind farm in Tamil Nadu has heard it: generation is down, and the wind was poor. Ask what that answer rests on.

"The wind was poor" is either a measurement or an excuse. After a while, an owner who hears it every year stops asking questions, which is worse. I do not think the explanation is always wrong. Some years are weak. But a weak year is a number, and a number has a source. A production-based availability, the kind DNV describes and IEC 61400-26-1 defines, already needs an estimate of the energy a machine could have made in the wind that actually blew. So a servicer who says the wind was poor should be able to show it: the wind speed, from which instrument, over which period, against which longer record. If that wind speed comes from the turbine's own nacelle sensor, it is the machine reporting on itself. That is not nothing, but it is not an independent measurement. If there is no wind figure at all, the explanation is an opinion. The reputation I would hate most in this business is the contractor who blames the wind. Not because the wind is never to blame. Because nobody checked. When were you last shown the wind data behind a poor year? Senthil Kumar Ramasamy — Managing Director

Source: DNV GL, Definitions of Availability Terms for the Wind Industry, white paper EAA-WP-15, 9 August 2017, p.6 (production-based availability). Source: IEC 61400-26-1:2019, Availability for wind energy generation systems.

#PavansaraRenewables #WindOandM

Quote card: "The wind was poor" is either a measurement or an excuse.
LikeCommentRepostSend

7 of 21

Why it was made this wayFor Andhra Pradesh owners who fear money they are owed being netted off something else.

Explains · How this work is contracted

Pavansara Renewables

Wind farm operations and repowering

Thu 13 Aug public, Text post

This matters if you own a wind project in Andhra Pradesh that earns Generation Based Incentive. The Supreme Court has said whose money it is. Generation Based Incentive is a central scheme that pays registered wind projects 50 paise for each unit fed into the grid. In Andhra Pradesh, the question was whether the regulator could take that incentive into account and set a lower tariff. On 25 March 2026 the Supreme Court held that it could not. In the court's words, the incentive "is intended to be disbursed to the GENCOs over and above the tariff". It also said that regulatory authority "cannot be exercised in a manner that nullifies the legislative or policy intent" of a scheme like this. For an owner, that settles how the two payments relate. The tariff is for the power. The incentive is for generating it. Neither is a discount on the other. The practical point is in the paperwork. A settlement that shows the two together makes it hard to see whether anything has been netted off. Owners whose projects earn the incentive now have a clear reason to read the two lines separately, every time. Two lines, read separately: the tariff, and the incentive. Do your statements show the incentive on its own line?

Source: Supreme Court of India, 2026 INSC 294, judgment of 25 March 2026, as reported by Verdictum, 26 March 2026. Source: King Stubb & Kasiva, note on the judgment, 16 June 2026 (the scheme's 50 paise a unit).

#PavansaraRenewables #AndhraPradeshWind #WindEnergyIndia

LikeCommentRepostSend

8 of 21

Why it was made this wayFor the owner told his site is tired, who fears spending on the wrong answer.

Explains · Diagnosis — is the site tired, or is the machine?

Pavansara Renewables

Wind farm operations and repowering

Fri 14 Aug public, Article post

When the wind falls, it falls on every machine on the site at once. A machine that falls behind its neighbours, and stays behind, is different.

That is the starting point of this month's long read, by our Managing Director, Senthil Kumar Ramasamy, published on his profile today. Most owners judge an old farm by its total: this year against last year. A falling total cannot say whether the wind changed or the machines did. Each machine read against its neighbours, month by month, can say a good deal more, and an owner can usually ask for that data. Wakes and terrain make neighbouring machines differ. What matters is a change: a machine that used to keep pace with its neighbours and no longer does. The article walks through how to read it, which availability figure belongs beside it, and what NIWE's 15% screening line says about an old machine. It also covers the answer nobody selling repowering likes to give: sometimes the site is tired, and the right move is to sell. It does not replace measuring the wind. It tells you whether you need to. The full piece is on Senthil Kumar Ramasamy's profile today.

Source: DNV GL, Definitions of Availability Terms for the Wind Industry, white paper EAA-WP-15, 9 August 2017. Source: Centre for Science and Environment, Repowering of the Indian Wind Sector — Opportunities and the Way Ahead, factsheet, December 2020 (NIWE's 15% line).

#PavansaraRenewables #WindOandM #WindRepowering

The graphic: Is it the wind, or the machine?
LikeCommentRepostSend

9 of 21

Why it was made this wayFor the owner taking a repowering to a lender, who fears it being priced as if the site had never generated.

Explains · Repowering in India — the 25.4 GW that has not moved

Pavansara Renewables

Wind farm operations and repowering

Mon 17 Aug public, Text post

Banks assess a repowering like a brand-new project. Its history is not priced. CSE's 2025 report on repowering is blunt about finance. Banks have no loan products built for it, and projects "often face very expensive loans or outright rejection". Lenders also struggle to value old turbines and parts, CSE says, so they find it hard to accept them as collateral. That misses what makes a repowering different from a new site. The wind is already proven, the land is held, and the connection exists, even if it needs upgrading. The help meant to close the gap went unused. Under the 2016 repowering policy, IREDA offered an extra 0.25% interest rebate. An RTI found that not a single project took it between 2016 and 2020. So the owner has to bring the advantage to the lender. Years of measured generation, the wind behind it, and a site assessment a lender can test. Without them, a repowering is credited as a new project and priced like one. A site's record is the collateral a bank cannot see unless someone puts it in front of them. Could you show a lender your site's measured wind today?

Source: Centre for Science and Environment (Binit Das), Facilitating Wind Repowering, 2025, chapter on mobilising investment. Source: Centre for Science and Environment, Repowering of the Indian Wind Sector — Opportunities and the Way Ahead, factsheet, December 2020 (the 2016 policy's 0.25% rebate; the RTI to IREDA, para 11).

#PavansaraRenewables #WindRepowering #WindEnergyIndia

LikeCommentRepostSend

10 of 21

Why it was made this wayFor the technical lead and asset manager who sign off an availability figure they may be misreading.

Explains · How a number is arrived at, and what it is worth

Pavansara Renewables

Wind farm operations and repowering

Tue 18 Aug public, Carousel, 4 pages

A turbine can count as available while it is not generating. It depends which availability your report uses.

Availability sounds like one number. It is at least four, and they answer two questions. The first is hours or energy. Time-based availability counts the hours a machine was available. Production-based availability counts the energy it made against the energy it could have made in the wind that blew. Across a farm, the two are often close. DNV says they differ by up to 2%, depending on the definitions used. One farm can still be far apart. At one Irish wind farm in 2007, machines were down 3% of the time but lost 11% of the energy. The difference is when the downtime falls. It can run the other way too. 3E, benchmarking 57 wind farms in Belgium, France and the Netherlands, found that good O&M practice makes production-based availability higher than time-based, because machines are generally stopped for maintenance in low wind. The second question is what is left out. Contractual availability is what the service contract defines, with some downtime left out by agreement. Technical availability has no such allowances, and DNV calls it the more accurate measure of how a machine performs. So a servicer can meet its contract in a month the owner loses energy, and both are telling the truth. Ask for the technical, energy-based figure beside the contractual one.

Source: DNV GL, Definitions of Availability Terms for the Wind Industry, white paper EAA-WP-15, 9 August 2017, pp.5–6. Source: N. Conroy, J.P. Deane and B.P. Ó Gallachóir, "Wind turbine availability: Should it be time or energy based? – A case study in Ireland", Renewable Energy 36(11), 2011, pp.2967–2971. Source: 3E, "Benchmarking predicted and actual production losses", 15 April 2016.

#PavansaraRenewables #WindOandM #WindEnergyIndia

Four ways to calculate wind turbine availability4 pages

Page 1: Available is not the same as generating.Page 2: Hours or energy?Page 3: What is left out?Page 4: Ask which one, in writing.
LikeCommentRepostSend

11 of 21

Why it was made this wayFor everyone who follows the page, on the renewable energy day.

Occasion

Pavansara Renewables

Wind farm operations and repowering

Thu 20 Aug public, Single image

Happy Akshay Urja Diwas to everyone working in India's renewable energy.

Today marks the work of the people who plan it, build it, run it and keep it running. Wind is a large part of that work. India's installed wind capacity stood at 57,443 MW, and wind generated 106 billion units in 2025–26 (Lok Sabha written reply, 22 July 2026). To everyone who keeps a machine turning, thank you.

#PavansaraRenewables #AkshayUrjaDiwas

The graphic: Happy Akshay Urja Diwas
LikeCommentRepostSend

12 of 21

Why it was made this wayFor the asset manager and technical lead who fear a capital line nobody priced.

Explains · Repowering in India — the 25.4 GW that has not moved

Pavansara Renewables

Wind farm operations and repowering

Fri 21 Aug public, Single image

The feeder was built for 200 to 600 kW machines. The new ones are 2 to 3 MW.

CSE's 2025 report says most ageing wind farms are still connected to 11 kV and 33 kV feeders. The early 11 kV systems were built for turbines of 200 to 600 kW. A repowered cluster of 2 to 3 MW machines asks those lines to carry far more. How much more can they take? CSE puts it at a minor increase, about 50%, within the existing 11 and 33 kV networks. Beyond that, the feeders have to move to 33 or 66 kV. That upgrade is a capital line of its own. A business case priced on the turbines alone does not include it. CSE also lists what happens without it: higher line losses, overloading and poor power quality, which cut what the new machines can actually deliver. The turbines are the visible part of a repowering. The wire decides how much of it reaches the grid. So the order matters. Find out the feeder's voltage and the substation's spare capacity before pricing a single machine. Two numbers come before any quote: the feeder's voltage, and the substation's spare capacity.

Source: Centre for Science and Environment (Binit Das), Facilitating Wind Repowering, 2025, chapter 3, "Aligning transmission systems".

#PavansaraRenewables #WindRepowering #WindEnergyIndia

The graphic: Built for 600 kW. Asked to carry 3 MW machines.
LikeCommentRepostSend

13 of 21

Why it was made this wayFor the O&M decision-maker who fears paying for an improvement nobody can check afterwards.

The offer · How this work is contracted

Pavansara Renewables

Wind farm operations and repowering

Mon 24 Aug public, Quote card

Signed by Kavitha Raman — Head of Asset Performance

A promised improvement is only as good as the number it starts from. Ask to see that number first.

A proposal for an old wind farm can promise better availability, more generation, a better year, and never write down the number the improvement will be measured from. Without that number, nobody can check the promise afterwards. A good year can be credited to the work, and a poor one to the wind. So we work to one rule. We measure before we promise, and we publish the before and after. The before is the farm as it runs today, machine by machine. The after is the same measure, taken the same way, once the work is done. If the two are measured differently, the comparison is not worth reading. Owners come back because the number we said at the start is the number they got. In wind maintenance, that is rarer than it should be. Before you sign, ask for the starting number in writing, and how it was measured. Did your last contract write down the number it started from? Kavitha Raman — Head of Asset Performance

#PavansaraRenewables #WindOandM

Quote card: We measure before we promise, and we publish the before and after.
LikeCommentRepostSend

14 of 21

Why it was made this wayFor the family selling two or three old machines, who fears the land is worth less than they thought.

Explains · Repowering in India — the 25.4 GW that has not moved

Pavansara Renewables

Wind farm operations and repowering

Tue 25 Aug public, Text post

Selling two or three old wind machines sounds like a simple way out. The grid connection may not go with them. Many of India's oldest machines are held by families and small firms, often two or three each, bought in the sector's early years for the accelerated depreciation benefit. For an owner like that, selling can look easier than repowering: no new machines, no consortium of neighbours, no lender. CSE's 2025 report on repowering names what gets in the way. Small owners, it says, lack exit options because of "asset valuation uncertainties and the inability to transfer grid evacuation rights to potential buyers". The connection is the part a buyer needs most. Without it, the land and the machines are worth far less to anyone who wants to repower them. CSE does not cite the instrument behind this, and the position may differ by state and by the terms of the original approval. So the order matters. Establish whether the evacuation approval can pass to a buyer, and on what terms, before naming a price. A price set before that answer is a guess. Do you know whether your connection would go with a sale?

Source: Centre for Science and Environment (Binit Das), Facilitating Wind Repowering, 2025, executive summary.

#PavansaraRenewables #WindRepowering #WindEnergyIndia

LikeCommentRepostSend

15 of 21

Why it was made this wayFor the asset manager weighing a repowering who fears buying a machine not built for the site.

Explains · Repowering in India — the 25.4 GW that has not moved

Pavansara Renewables

Wind farm operations and repowering

Thu 27 Aug public, Carousel, 4 pages

India's best old wind sites are also its most turbulent. Few new machines are certified for them.

India's oldest wind machines stand mostly on its best land: high average wind and high turbulence. In the standard's terms, Class I sites with turbulence category A, an intensity of 0.16. Machines for those sites are built heavier, because they must carry that load for their whole working life. CSE reviewed the approved list of turbine models in 2025: 35 models from 14 makers. It found only a handful rated for that turbulence, and many of those below 1 MW. A large number of the modern 3 to 5 MW machines are Class S, designs certified for a specific site rather than a standard class. That is not a fault in itself. A Class S machine can suit a Class I site, if the assessment for that site says it can. It does mean the question is never just which machine. It is which machine, certified for what, against which measured site. The best old land is where the choice of new machine is narrowest. Ask for the class and turbulence category the proposed machine is certified for, and the site assessment that matches it.

Source: Centre for Science and Environment (Binit Das), Facilitating Wind Repowering: Addressing Barriers in Manufacturing, Finance, and Infrastructure for Legacy Wind Farms, 2025, chapter 2 (the RLMM of May 2025).

#PavansaraRenewables #WindRepowering #WindEnergyIndia

Turbine certification for India's old wind sites4 pages

Page 1: The best old sites. Few new machines rated for them.Page 2: Of the few rated, many are below 1 MW.Page 3: Many 3 to 5 MW machines are Class S.Page 4: Ask what it is certified for.
LikeCommentRepostSend

16 of 21

Why it was made this wayFor the owner told the farm is just ageing, who fears spending on the wrong answer.

The offer · Diagnosis — is the site tired, or is the machine?

Pavansara Renewables

Wind farm operations and repowering

Mon 31 Aug public, Single image

We will tell you whether your site is tired, or the turbine standing on it. Send us twelve months of generation, machine by machine.

Here is the offer, in full. Send us your last twelve months of generation, machine by machine. We will tell you whether the site is tired or the turbine standing on it is. Why machine by machine? A farm's total mixes the wind and the machines into one number. Each machine, set against its neighbours, starts to separate them. On one cluster, the owners had been told for years that the wind was poor. Four months of measurement found two machines that had not turned in eleven weeks. The answer decides what the money is for. If it is the turbine, the choice is between fixing it and replacing it. If it is the site, a new machine is money spent in the wrong place. Sometimes the answer will be the site, and we will say that too, even though our main work is repowering. Send the data here, or with the Contact us button on this page. Twelve months, every machine, one straight answer.

#PavansaraRenewables #WindOandM #WindRepowering

The graphic: Tired site, or tired turbine? We will tell you.
LikeCommentRepostSend

17 of 21

Why it was made this wayFor owners who fear being told a low number is normal, and believing it.

Point of view · Diagnosis — is the site tired, or is the machine?

Senthil Kumar Ramasamy

Managing Director, Pavansara Renewables

Wed 5 Aug public, Text post

"Normal for its age" is an answer about the machine. Owners hear it about the land. I hear it on old sites all the time. Generation is low, and someone has told the owner that is normal for a machine of that age. Sometimes it is exactly right. CSE puts India's old sub-megawatt machines on its best wind sites at a capacity utilisation factor of 10 to 14%. A 1990s machine on good land does that. NIWE's own screening rule says a machine below 15% is technically ready for repowering. So a reading of 12%, inside that range, is not a verdict on the site. It is a verdict on the turbine standing on it. Where it goes wrong is the next step. The owner hears "normal", decides the site is tired, and stops asking. Some of those sites are among the best wind land in the country. When I started in this work, I was watching Indian sites run at half of what they should. The question I still ask first is not how old the machine is. It is what this land could do with a different one. Sometimes the land really is the problem. You only know after you have looked. When you were last told a number was normal for its age, did anyone say what the land could do?

Source: Centre for Science and Environment (Binit Das), Facilitating Wind Repowering, 2025, chapter 2 (10–14% CUF for old machines on Class I sites). Source: Centre for Science and Environment, Repowering of the Indian Wind Sector — Opportunities and the Way Ahead, factsheet, December 2020, para 7 (NIWE: below 15% CUF, technically ready for repowering).

#PavansaraRenewables #WindRepowering

LikeCommentRepostSend

18 of 21

Why it was made this wayFor peers and fund managers who fear repowering is stuck for reasons nobody is working on.

Point of view · Repowering in India — the 25.4 GW that has not moved

Senthil Kumar Ramasamy

Managing Director, Pavansara Renewables

Wed 12 Aug public, Text post

India has 25,406 MW of wind on machines below 2 MW. The engineering is the easy part. That figure is NIWE's estimate of the country's repowering potential, as CSE's 2025 report gives it. It counts machines below 2 MW, which is the 2023 policy's own line. In my view almost none of it has moved, and the reason is not the turbines. It is who owns them. A large share of the old capacity belongs to individuals and small firms who came in for the accelerated depreciation benefit, CSE says. Repowering means fewer, larger machines on the same land. So an owner with two machines in a cluster can end up with less than one. Consent has to be assembled across all of them, and that is slow work. Selling is not simple either. CSE lists the inability to transfer grid evacuation rights to a buyer among the things keeping small owners from leaving. And help that was offered went unused. Under the 2016 policy, an RTI found not a single project took IREDA's repowering interest rebate between 2016 and 2020. That is a paperwork problem being treated as an engineering problem. Until someone works on the ownership, the 25,406 MW will stay where it is. If you hold two machines in a cluster, who else would have to agree?

Source: Centre for Science and Environment (Binit Das), Facilitating Wind Repowering, 2025 — Table 1 (NIWE's 25,406 MW), the ownership and evacuation-rights findings. Source: Centre for Science and Environment, Repowering of the Indian Wind Sector — Opportunities and the Way Ahead, factsheet, December 2020, para 11 (the RTI to IREDA).

#PavansaraRenewables #WindRepowering

LikeCommentRepostSend

19 of 21

Diagnosis — is the site tired, or is the machine?

Senthil Kumar Ramasamy

Managing Director, Pavansara Renewables

Fri 14 Aug public, Article

Tired site or tired turbine: what your own data can tell you before you spend anything

A falling farm total cannot say whether the wind changed or the machines did. The farm's own records, read machine by machine, usually can, and most owners already hold them.

When the wind falls, it falls on every machine on the site at once. A machine that falls behind its neighbours, and stays behind, is telling you something the wind cannot.

That is the whole method in two sentences, and in my experience most owners of old wind farms never use it. They judge the farm by its total: this year against last year. When the number has been falling for a few years, the conclusion arrives on its own. The site is tired.

Sometimes it is. More often, on the old sites I see, the wind is where it always was and something on the site has changed. This piece is about telling the two apart with data most owners already hold, before anyone spends money on a new contract, a new machine or a measurement campaign.

Why the farm’s total cannot answer the question

A year’s generation is several things added together: how hard the wind blew, how many hours each machine was able to run, how well each machine turned the wind it got into power, and whether all of it was reported.

A weak wind year, a machine that has quietly lost performance, a machine that stopped and a gap in the reporting all show up the same way, as a smaller total. Lining up more years of totals does not separate them. It only makes the decline look more like a trend.

That is why the comparison that works is not year against year. It is machine against machine.

Read each machine against its neighbours

Start with the monthly generation of every machine on the farm, for as many years as the records go back. It sits in the turbines’ own SCADA records, and an owner can usually ask the servicer for it. In my experience, few owners ever ask for it in that form.

Then compare each machine with its nearest neighbours of the same model, month by month. Not with the farm average, which the weakest machines drag down, but with the machines beside it.

Neighbours never match exactly. Wakes, terrain and spacing mean some positions on a site always do better than others, and the pattern moves with the wind’s direction through the year. That is expected. What you are looking for is not a difference. It is a change in the difference.

A machine that has always made a little less than the one beside it is telling you about its position. A machine that used to keep pace and now falls behind, month after month, is telling you about itself. A weak wind year moves the whole row together. A worn gearbox, a blade whose leading edge has worn, a rotor that no longer points squarely into the wind: those move one machine.

Compare the same month across different years, so the season is the same. Three patterns matter. A machine whose share of its row’s output has fallen and not come back is a question about that machine. A machine with months missing, or flat at nothing, is a stoppage or a gap in the reporting, and both need explaining. The whole row falling together is the one pattern no comparison between neighbours can explain.

The first two are questions about machines. The third is the one that needs the wind measured.

Which availability figure goes beside it

Generation says that a machine fell behind. The availability figure in the monthly report is meant to say why. Before reading it, ask which figure it is, because every availability number answers two questions.

The first is time or energy. Time-based availability counts the hours a machine was able to run. DNV, in its paper on how availability is defined, notes that it “may not capture the added importance of a turbine’s availability during high wind periods”. Production-based availability counts energy instead: what the machine made, against what it could have made in the wind that actually blew. For an owner it is the more useful number, and it needs something the time-based figure does not, an estimate of that wind.

The second is what is left out. Contractual availability is the figure the service contract defines, and DNV says such figures “typically have certain ‘carve-outs’ or allowances”. It also says contractual values “often cannot be used directly as energy loss factor”. Technical availability takes no allowances, and DNV calls it “a more accurate measure of technology performance”.

So the figure that belongs beside a machine’s generation is the technical, production-based one. If a report gives only a contractual, time-based number, it is answering the contract’s question, not yours. IEC 61400-26-1 defines both time-based and production-based indicators, so asking for the second is not an unusual request.

What NIWE’s 15 per cent line says, and what it does not

NIWE’s screening rule, as CSE reports it, is that any wind machine with a capacity utilisation factor below 15 per cent is technically ready for repowering, and that its CUF “can be at least doubled, or in wind-intensive sites, tripled”.

It is a useful line, and it is easy to misread. It is a rule about machines on land that has the wind. On such land, an old machine below 15 per cent is leaving energy behind. The line does not tell you that your land has the wind. A machine below 15 per cent on a weak site is not leaving anything behind; it is getting what the site has.

So the line tells you where to look, not what you will find. Read machine by machine, it picks out the machines worth a closer look. Read as a farm average, it hides them among the rest.

When is the farm’s own data no longer enough? When the whole row has fallen together, so the neighbours have nothing to say. When the decision on the table costs real money, a new contract or a repowering. And when the only wind figure anyone has comes from the turbines’ own nacelle sensors, which describe the conditions the machine itself sees.

Then the wind needs measuring independently: a mast or a lidar on site, at hub height. A wind resource assessment needs on-site measurement over “a minimum of a one year period”, with the short record then extended to the long term against historical data. It is not cheap, and it is the one thing that settles the question when the machines cannot.

When the site really is tired

Sometimes the measurement comes back and the wind is not there. The original assessment was optimistic, or what stands around the farm has changed, or the site was always marginal.

Then the right answer is not a new machine. I will not recommend repowering a site where the wind does not justify it. A larger turbine on weak land is a larger cost on weak land.

Sometimes the right answer is to sell. It is not an answer anyone selling repowering likes to give. It is still the answer the measurement supports, and an owner is better off hearing it before the money is spent than after.

The objection

The fair objection to all of this is that neighbour comparisons are crude. Wakes, terrain and different machines make neighbours differ, the records are often messy, and only a proper assessment counts as evidence.

All of that is true. The comparison is not a measurement, and it should never be presented as one. What it detects is change: a machine drifting away from neighbours it used to keep pace with. Wakes and terrain do not do that on their own, because they stay where they are from one year to the next, unless something new has been built nearby.

And the comparison costs nothing. The records already exist. Reading them tells you whether the expensive step, the measurement, is worth taking, and where on the farm to point it.

What to do before the next decision

Before the next decision about an old farm, whether to renew the contract, repower or carry on, ask for three things. Every machine’s monthly generation, for as many years as the records go back. The technical, production-based availability beside it. And, if the whole row has fallen together, an independent measurement of the wind.

If one machine falls behind its neighbours, the problem is on the site, not in the sky. If they all fall together, measure. And if the measurement says the wind is not there, believe it.

LikeCommentRepostSend

20 of 21

Why it was made this wayFor owners and fund managers who fear being pushed into repowering, or out of it, by whoever is selling.

Point of view · Repowering in India — the 25.4 GW that has not moved

Senthil Kumar Ramasamy

Managing Director, Pavansara Renewables

Thu 20 Aug public, Text post

Karnataka has made it easier for an old wind farm to carry on. For some owners, that is the right answer. Since July, an owner whose first 20-year PPA is ending can renew for ten more years at 85% of the twentieth-year tariff, if the application goes in at least 90 days before expiry. I expect to hear that this will slow repowering in the state. Maybe. I do not think that is a bad thing on its own. I will not recommend repowering a site where the wind does not justify it. On a weak site with a sound machine, ten more years at 85% can beat a new machine that never earns back its cost. On a strong site with a tired machine, renewing is the expensive choice. It just does not look expensive, because nothing new is bought. The age of the machine does not tell you which case you are in. The measured wind on the site does, and so does what the machine makes of it. That is the work to do before the 90 days run out, not after. Renew or repower, the answer is in the land, not in the calendar. Which of your sites would you renew today, and on what evidence?

Source: Karnataka Electricity Regulatory Commission, suo motu order of 1 July 2026, as reported by WindInsider, 6 July 2026.

#PavansaraRenewables #WindRepowering

LikeCommentRepostSend

21 of 21

Why it was made this wayFor owners being sold a repowering who fear a project that passes the test and loses money.

Point of view · How a number is arrived at, and what it is worth

Senthil Kumar Ramasamy

Managing Director, Pavansara Renewables

Thu 27 Aug public, Text post

I have told four owners in three years that their site was not worth repowering. I told them to sell. Qualifying was never the question. The 2023 national policy asks a repowered project to show at least 1.5 times the old generation. That number decides whether a project counts as repowering. It does not decide whether it pays. What decides that is the wind on the site, the grid it connects to, and what the power will sell for. A site can clear 1.5 times and still not earn back the new machines. On those four sites, the measured wind did not justify the cost of new machines. Each time, that was a repowering job we did not do. I would rather an owner heard it from the people who could have done the work. The question I ask instead of "does it qualify" is simpler: what will this land produce with a new machine on it, measured, and what will that be worth? A policy floor is easy to clear and easy to sell. The site is harder to argue with. Clearing the floor is not a business case. Has anyone ever told you a site of yours was not worth repowering?

Source: Centre for Science and Environment (Binit Das), Facilitating Wind Repowering, 2025 (the 2023 national policy: "at least a 1.5x increase in actual energy generation").

#PavansaraRenewables #WindRepowering